FG begins technical audit of power sector, targets infrastructure replacement

Business Pointers

By Seun Ibiyemi

The Federal Government has commenced a technical audit of Nigeria’s power sector to identify critical infrastructure requiring urgent investment and replacement, Minister of Power, Joseph Tegbe, has said.

Tegbe disclosed this on Monday during an interview on TVC Breakfast, explaining that the exercise was designed to guide government spending and prevent the allocation of funds to infrastructure that does not require immediate intervention.

He lamented the poor state of electricity infrastructure across the country, noting that ageing facilities across the power value chain, some of which are between 30 and 50 years old, have contributed to Nigeria’s low electricity generation.

According to the minister, the technical assessment has identified critical transmission challenges along major corridors, including Benin-Egbin, Oshogbo-Ikeja and Afam.

He said President Bola Tinubu had approved funding for the replacement of the identified infrastructure following the assessment, adding that work on critical facilities would commence within the next one to two months.

The minister also identified inadequate distribution infrastructure as a major challenge affecting electricity supply, citing the recent incident involving a burnt feeder panel that left residents of Magodo, CMD and Shangisha areas of Lagos without electricity for 11 days.

He said the prolonged outage exposed the need for electricity distribution companies to maintain sufficient stocks of replacement equipment to ensure prompt response to faults and minimise disruptions to consumers.

READ ALSO:Oyetola secures $200m World Bank funding to boost Nigeria’s fish production

Tegbe disclosed that the Federal Government was engaging distribution companies to strengthen their preparedness and ensure that shortages of critical equipment did not result in prolonged electricity outages.

On efforts to expand transmission capacity, the minister said the government had approved the construction of additional transmission stations in Mowe and the Ajah axis of Lagos State.

He explained that the projects were intended to address rising electricity demand in the areas and improve the capacity of the transmission network to deliver power to consumers.

The planned infrastructure replacement and expansion form part of the government’s efforts to address longstanding challenges across the generation, transmission and distribution segments of Nigeria’s electricity sector.

Leave a Reply

Your email address will not be published. Required fields are marked *